The Gap From Scientific System Approach Down To Industrial Power Plant Control Engineering
p. 50-77
Résumé
The aim of this paper is to highlight some process control competitiveness deposits to improve process control engineering. Rationale scientific foundations should be a significant contribution to improve process control of the future. To anticipate control systems through control engineering, we focus our interest in the definition of process control requirements and the definition of perennial control and document requirements, whatever the implementation into oFthe-shelves I&C devices should be.
Texte
Citer cet article
Référence papier
Dominique Galara et Jean Pierre Hennebicq, « The Gap From Scientific System Approach Down To Industrial Power Plant Control Engineering », CASYS, 2 | 1998, 50-77.
Référence électronique
Dominique Galara et Jean Pierre Hennebicq, « The Gap From Scientific System Approach Down To Industrial Power Plant Control Engineering », CASYS [En ligne], 2 | 1998, mis en ligne le 28 June 2024, consulté le 20 September 2024. URL : http://popups.lib.uliege.be/1373-5411/index.php?id=389
Auteurs
Dominique Galara
Electricité de France - Research and Development Department, Power Plant Control Branch, 6, quai Watier, BP 49, 78401 Chatou, Cedex, France
Jean Pierre Hennebicq
Electricité de France - Generation and Transmission Division, Hydro and Fossil fuel plant Operation, 34-40, rue Henri Regnault, Paris La Défense, France